Majestic Epoxy Fayetteville installs commercial kitchen epoxy flooring that meets the demanding needs of restaurants and food facilities in Fayetteville, AR.
Majestic Epoxy Fayetteville installs commercial kitchen epoxy flooring that meets the demanding needs of restaurants and food facilities in Fayetteville, AR. Our systems are non slip, seamless, and easy to sanitize, helping you maintain health code compliance. We design coatings to handle hot spills, frequent cleaning, and heavy kitchen equipment. Count on a safe, durable floor that supports your staff and operations.
Majestic Epoxy Fayetteville provides professional commercial kitchen epoxy flooring throughout Fayetteville, AR, Arkansas and the surrounding area. Our licensed, insured crew delivers safe, clean, on-time work with a free estimate before anything begins. Call (479) 346-8832 or request your free quote.
Busy Fayetteville kitchens are tough on floors. Hot fryer spills, dropped pans, constant mopping, and heavy traffic from cooks and servers all add up. Commercial kitchen epoxy flooring from Majestic Epoxy Fayetteville is built specifically for that kind of punishment.
Epoxy flooring is a multi-layer system that bonds to your concrete slab and creates a seamless, nonporous surface. In a restaurant or commercial kitchen, that means no grout lines, fewer hiding spots for grease and bacteria, and much easier cleanup after a long shift. When installed correctly, epoxy floors stand up to degreasers, frequent sanitizing, rolling equipment, and thermal shock better than standard tile or bare concrete.
In Northwest Arkansas, health inspectors pay close attention to floor conditions in food prep and dish areas. Cracked tile, loose grout, and ponding water are common violations. Our epoxy systems are designed to slope properly to floor drains, resist moisture intrusion, and maintain traction even when wet, which helps you stay ahead of inspections and safety issues.
Majestic Epoxy Fayetteville focuses on practical, code-conscious installations for restaurants, cafeterias, church kitchens, breweries, and food prep facilities around Fayetteville, Springdale, and the surrounding area. We match the system to the way your kitchen is actually used, not just what looks good in a brochure.
Restaurant and commercial kitchen epoxy is only as good as the prep. Here is how a typical project with Majestic Epoxy Fayetteville actually runs, from first visit to final walk-through.
1. Site visit and inspection We start by walking the space with you. We look for existing floor failures, such as hollow tile, deteriorated concrete, ponding around drains, and grease-saturated areas, especially near fryers and dish machines. We also note health department requirements, existing floor slopes, and where you need a cove base (a curved floor-to-wall transition) for sanitation.
2. Moisture and slab testing Commercial kitchens in older Fayetteville buildings sometimes have moisture issues in the slab. We perform moisture testing where needed. If vapor pressure is high, we plan for a moisture mitigation primer so the epoxy will not blister or peel later.
3. Demo and surface preparation For tile removal, we demo the tile, mechanically remove adhesive, and get down to clean concrete. For bare or painted concrete, we use industrial grinders or shot blasting to open up the surface and create a proper profile. This roughens the concrete so the epoxy can mechanically bond. Any oil or fryer grease stains are treated using degreasers and repeated grinding until we get a clean, absorbent surface.
4. Concrete repair and drainage correction We repair cracks, fill joints that should be closed, and patch low spots with epoxy mortar. In kitchens that do not drain correctly, we can adjust slopes with patching compounds so that water runs toward floor drains. This is critical in dish rooms and cook lines where constant washing and rinsing happens.
5. Priming and base coats Once the slab is prepared, we install an epoxy primer to seal the concrete and promote adhesion. In heavier duty kitchens (brewpubs, hotel kitchens, large cafeterias) we typically apply a high-build epoxy or urethane cement base coat. This provides thickness and impact resistance.
6. Texture and topcoats We broadcast texture aggregate (usually silica or aluminum oxide) into the wet coating to create slip resistance. Then we apply a chemical-resistant topcoat, often a polyurethane or polyaspartic in kitchens that see frequent hot water washdowns and harsh cleaners. The number of coats and total thickness depend on traffic and abuse level.
7. Curing and return to service Cure time is planned around your downtime. Fast-curing systems can be turned around in 24 to 36 hours for smaller projects. Larger kitchens may need a 2 to 3 day shutdown. We give you clear guidance on when you can walk, move equipment, and resume full operations so you do not damage the new floor.
Not every commercial kitchen epoxy flooring system is the same. Majestic Epoxy Fayetteville helps you choose a system that fits your type of operation, budget, and sanitary requirements.
Epoxy vs urethane cement For lighter and medium duty kitchens, a high-build epoxy system with a polyurethane topcoat often makes sense. It is cost effective and holds up well in prep areas, bakeries, and low to moderate heat environments. For high-heat and heavy duty operations, especially near fryers, ovens, and steam kettles, we often recommend urethane cement (also called urethane mortar). It tolerates thermal shock from hot water and can handle heavier point loads from equipment stands.
Texture and slip resistance Kitchen safety depends heavily on traction. We can dial in the texture level based on how wet the area stays. Cook lines, dish rooms, and bar dish areas usually get a more aggressive grit. Prep rooms and dry storage may get a medium texture that is easier to mop. We discuss your cleaning methods and footwear so you get a surface that reduces slips without becoming hard to clean.
Color choices and zoning Most restaurants choose lighter, solid colors like light gray, beige, or safety yellow around hazard areas because they show spills and debris quickly. Some owners prefer color zoning, such as one color for food prep, another for dish, and a third for walk-in coolers. This can help staff maintain separation between clean and dirty processes.
Integral cove and wall transition Health inspectors in Washington and Benton Counties often look for easy-to-clean junctions where the floor meets the wall. We commonly install integral epoxy or urethane cement cove that turns up the wall 4 to 6 inches. This eliminates the 90-degree corner where grime builds up and makes mop cleaning faster and more effective.
Add-ons for busy kitchens If your kitchen uses rolling racks, speed racks, or heavy carts, we can increase floor thickness, reinforce high impact zones, and specify topcoats with higher abrasion resistance. In breweries, wineries, and coffee roasteries, we can choose resins that stand up better to acids and sugars that are common in spills.
Every restaurant and commercial kitchen epoxy flooring project in Fayetteville has different conditions, which is why prices can vary. Majestic Epoxy Fayetteville is upfront about the main factors that influence your total cost and schedule.
1. Existing floor removal Removing quarry tile, thick adhesives, and failed coatings takes more labor and equipment than coating bare concrete. If we are working in a historic building around Downtown Fayetteville, it is common to find multiple flooring layers that must be removed, which adds to cost.
2. Concrete condition and drainage Slabs that are cracked, out of level, or sloped away from drains require more repair material and time. Adding or correcting slope so water moves to floor drains is one of the best investments you can make, but it does influence the budget.
3. System type and thickness Urethane cement systems cost more than basic epoxy, but they also last longer in very demanding kitchens. If you tell us the expected life of the space (for example, a 3 year lease-out vs a long-term owner-occupied building), we can right-size the system to avoid overspending or underbuilding.
4. Kitchen size and phasing Smaller kitchens might be done in a single shutdown. Larger facilities at schools, hospitals, or corporate cafeterias might be completed in phases so part of the operation can stay active. Phased work often costs a bit more because of extra mobilizations and containment.
5. Operating schedule and overtime If you need overnight or weekend work to avoid lost revenue, we can do that, but off-hours projects may carry a premium. Fast-cure systems that allow a quicker return to service can also cost more in material but may save you money overall by reducing downtime.
We provide written proposals that spell out exactly what is included: surface prep method, repair scope, product types, number of coats, texture level, and estimated cure time. There are no vague line items like βmisc materials.β If we uncover hidden conditions, such as badly deteriorated concrete under tile, we show you the issue and discuss options before proceeding.
Food service flooring in Fayetteville is not just about appearance. It also needs to satisfy Arkansas health codes and local building officials. Majestic Epoxy Fayetteville works with owners, GCs, and architects so your commercial kitchen epoxy flooring supports compliance, not conflict.
Health department expectations The Arkansas Department of Health and local inspectors generally look for floors in food prep and warewashing areas that are smooth, durable, nonabsorbent, and easily cleanable. They also expect properly sealed floor-to-wall joints and floors that drain and do not accumulate standing water. We design our systems with those expectations in mind, including integral cove where needed and correct slopes around drains.
Building permits and coordination For many tenant finish-outs in Fayetteville, your general contractor or architect will handle permits. Commercial kitchen epoxy flooring typically falls under finishes, but if we adjust drainage or infill old trench drains, that may involve coordination with plumbing and inspection schedules. We are used to working within larger build-outs and can coordinate our work window to avoid conflicts with hood installation, walk-in cooler setup, or equipment deliveries.
What you should ask any epoxy contractor Before you hire anyone for restaurant or commercial kitchen epoxy flooring, ask these questions:
β’ What surface prep will you use, and how will you remove grease contamination before coating? β’ How thick will the system be in mils or inches, and what specific products are you installing? β’ How are you achieving slip resistance, and can you adjust it by area (cook line vs storage)? β’ How will you protect drains, coolers, and equipment during install, and who moves what? β’ What is the cure time before foot traffic and before rolling equipment?
If a contractor cannot answer these clearly or gives only vague promises, you may end up with a floor that looks fine on day one but fails under real kitchen conditions.
Scheduling and preparation Most Fayetteville restaurants try to schedule flooring work between menu changes, remodels, or slow periods. Before we arrive, we will give you a prep checklist that covers shutting down gas and water where necessary, emptying low shelving, moving mobile equipment, and protecting any items that cannot leave the space. Good planning keeps your shutdown as short as possible and helps your new floor perform as intended.
Professional restaurant and commercial kitchen epoxy, done right the first time, quality materials, honest pricing, and results that last.Majestic Epoxy Fayetteville